New House Construction (Germantown) (New House Index)
Electrical, Insulation, and Drywall (March 2016)
To enlarge a photo, click on it. Each photo is named in the following format: YMD-HMS. Hover over a photo to view this information.
View on YouTube (New Window)  | 
View on YouTube (New Window)  | 
February = Warm, March = Snow (Go figure...)  | 
We should have kept the tub in the hallway...  | 
Ephraim Running and Falling through Vent... Watch Here: On YouTube  | 
Kitchen Island Anchor...  | 
Looking East from Appleton Ave. (near Holy Hill Rd.)  | 
Our house is at the center of the circle...  | 
Distance: 1.75 miles, Elevation: 150 feet, Focal Length: 250mm  | 
Elliot helping build the house... Watch Here: On YouTube  | 
View from the vacant lot across the street (see the panoramic photo at the bottom of this page)...  | 
...but what about Roll??  | 
Blowing the Insulation from the Truck... Watch Here: On YouTube  | 
Natural Gas installation...  | 
Panoramic (Middle House):
Panoramic View... Watch Here: On YouTube  |